Why Pump Station Design Changes When the Site Is an Airport, Factory, or Business Park

Pumping projects can seem simple on paper: water flows into one place and is required to move to another. However, there are many factors that can affect the distance between two points including elevation, flow rate, solids, pressure, storage capacity, and access for maintenance.

Romtec Utilities’ way of design a pumping station is to define the operational requirements. This is accomplished prior to selecting the appropriate equipment. Then, the initial design and budgetary details could be developed based on what the needs of the project.

Image credit: romtecutilities.com

Start With One Question What’s the Next Step?

The engineering is changed immediately.

There are significant variations in the rate of flow of household sewage. A wastewater lift station must move that wastewater reliably when gravity conveyance is unavailable or insufficient. Engineers need to consider the anticipated inflow and the conditions of peak, pumping capacity as well as wet-well behaviour and discharge specifications, and the way in which equipment is maintained and operated.

The issues of industrial water differ. Fluids that are caustic, oily or that have high temperatures or pressures could be required by a manufacturing or processing facility. Romtec Utilities designs systems for industrial applications, ranging from food processing to power generation to databases, pharmaceutical waste, oil and gasoline facilities.

Rainfall has a completely distinct Operating Cycle

Stormwater systems can be inactive for prolonged periods of time and then suddenly confront an enormous volume of water during the course of a storm.

A stormwater liftstation that is connected to an detention basin must be able to work as part of the larger drainage plan for the site. When the runoff flows into the detention basin. The temporary storage handles immediately the volume and the pumping system transports the water collected to an authorized discharge point.

Romtec Utilities provided this solution to develop an Norco business park in California. This project needed a pumping device to drain a detention basin into the stormwater network of the public. The station was to be planned as a component of the drainage infrastructure for the development, and not as a separate piece equipment.

Package Does Not Mean “Off the shelf”

Many people believe that a package-pumping system is just a predetermined set of components.

In the case of engineering infrastructure packaging may be a way of ensuring that all the major components are integrated into one system. Controls, pumps and meters along with the structural elements and other equipment, are able to be picked according to the duty conditions.

It is especially useful for connecting a new system with an existing infrastructure. Industrial facilities and municipal facilities might not provide ample space to install or maintain in good condition. The equipment may have to be adapted around existing piping systems, structures electric system, as well as operating schedules.

The Real Costs of Capacity Planning

The cost of undersizing is particularly high when facilities grow.

Romtec Utilities supplied a sewer lift station at Portland International Airport for the PDX Next extension. The new station is designed to double the peak-flow capability of the existing system as airport facilities grow.

This is a great illustration of a fundamental engineering principal: Design conditions must not be limited to what a facility can manage on an average afternoon. Engineers should also understand what happens during the peak of demand.

The Work isn’t Done until the Equipment is delivered

Then, drawings and calculations need to be transformed into an operating system. Installation coordination, startup testing documentation, as well as operator understanding are all factors that contribute to the long-term success of.

A well-engineered pumping system is largely determined by what happens years after construction. If the flow increases, a major storm arrives or equipment needs maintenance, the decisions made during the initial design phase become apparent.

Romtec Utilities integrates these decisions into a pumping service specifically tailored to a project. This allows us to transform each piece of equipment into an infrastructure built for the specific conditions it will be confronted with.