What Will an Operator See When They Open the Station Five Years From Now?

If you draw an outline around the lift station on an urban map it is simple to imagine it as an element of self-contained equipment.

Water arrives somewhere, flows through the station before it moves on to another place. The facility also depends on controls, power access to the site structural components, and connections to surrounding infrastructure.

Image credit: romtecutilities.com

For project teams searching for the best lift station designers, one useful question is whether the engineering considers those interfaces not merely what happens inside the station.

Start Upstream of the Wet Well

For an example, take the possibility of a new residential development. The wastewater moves through the system of collection to the lift station. The elevation of the station and the inbound flow conditions determine the amount of waste the station is capable of handling.

After the water is wet, another set if engineering choices are made. Pumps, piping, valves control, structural parts, and potentially other equipment must be adapted to the requirements.

Romtec Utilities is a wastewater design company that creates systems to meet the specific needs of each site, whether it be industrial, commercial, or municipal.

This is due to the fact that the project-specific procedure can be crucial since changes in what occurs upstream could change the requirements of the pumping system to accomplish.

Be sure to follow the water that flows beyond the Pumps

The issue is not over once the liquid has left the well. The pumping system must move it according to the hydraulic conditions of the downstream system. The configuration of the pump and requirements for flow are influenced by the required head and flow conditions.

This is particularly crucial in evaluating the top wastewater design firms. The pump might have impressive specifications on its own, but its performance needs to fit into the whole hydraulic system.

Romtec Utilities is able to develop all the components which make up a pumping plant, including the structure and mechanical components, as well as the electrical and communication as a unit. This makes it easier to coordinate the equipment needed for the project.

Stormwater Has Its Own Network of Connections

Stormwater is a unique infrastructure puzzle. The runoff from the surface that is developed can enter an infrastructure for collection and flow through drainage, detention or flood control. When pumping is required the station can be considered a key element within the larger stormwater strategy.

It is vital for those searching for the most efficient stormwater engineers to take into account the location’s conditions, flows, the head specifications, environmental factors and the stormwater plans in general.

Romtec Utilities supplies customized stormwater pumping systems for commercial, residential industrial, municipal and projects instead of relying upon one configuration for each project.

Coordination Extends Above Ground Too

Not all interfaces involve pipe. Electrical service must support the equipment. Control and communication equipment must be compatible with the specifications of the project. Contractors need appropriate plans and documents. Access to the physical location may be required for startup, installation, and later service.

This can be a complex project that has multiple participants and disciplines, so having a clear and concise system document is vital. Romtec Utilities can provide complete plan of work and documentation, and also provide assistance to its systems during the initial phase of testing, commissioning and startup.

See Beyond the Station Boundary

If the external connections of a lift aren’t assessed, a well-designed lift station might remain a component of it’s a poorly planned project.

Water gives a different perspective on design. Where did it come from? What conditions should it fulfill before it can reach the station? What must happen while it’s there? Where will it go? What infrastructure enables the entire process?

By answering these questions, you can transform the design of a lift station from an equipment exercise into infrastructure engineering.